1. AN ASSESSMENT OF THE DESIGN AND CONSTRUCTION OF 5KVA INVERTER
BACKGROUND OF THE STUDY: The unreliability of the nation's electrical power supply is a well-established truth in today's society. There is now a substantial disruption in the provision of electrical power over the whole planet. As a consequence of the disruption in... Read More
2. DESIGN AND CONSTRUCTION OF 1KVA UNINTERRUPTED POWER SYSTEM (UPS)
ABSTRACT: A UPS system is a DC to AC conversion system of 1KVA power rating and expected to carry around 800 watts load. It provides power to electronic and electrical appliances such as radio sets, TV DVD/VCD, computers, fans and lighting. The design was conceived and put d... Read More
3. DESIGN AND CONSTRUCTION OF 5KVA POWER INVERTER
BACKGROUND OF THE STUDY: It is a well known fact today that electrical power supply is not reliable. All over the world, there is a significant electrical power supply interruption. Because of these electrical power supply interruption, many electrical instruments have... Read More
4. CONSTRUCTION OF 1KVA INVERTER USING SOLAR PANEL
INTRODUCTION: Every hour the sun beans on to earth more than enough energy to satisfy global needs. A solar energy is the technology used to harmless the scene’s energy and makes it usable, a solar inverter here in converting the direct current (D.C) into alternating c... Read More
5. DEVELOPMENT AND DESIGN SPACE EXPLORATION OF DEEP CONVOLUTION NEURAL NETWORK FOR IMAGE RECOGNITION
CHAPTER ONE
Introduction
ntroduction to Neuro-Inspired Read More
6. DESIGN AND IMPLEMENT AN ARTIFICIAL INTELLIGENCE DIETITIAN WITH PYTHON
CHAPTER ONE
INTRODUCTION
Overview
Recent estimates suggest that poor dietary habits are linked to one in five early deaths globally (Afshin et al., 2019). Tackling t... Read More
7. A CUCKOO SEARCH BASED CO-ORDINATION OF DISTRIBUTED GENERATION UNITS AND SHUNT CAPACITOR BANK IN RADIAL DISTRIBUTION NETWORKS
ABSTRACT
This research work presents the Application of Cuckoo Search Algorithm for the simultaneous placement of distributed generation units and shunt capacitor banks in radial distribution networks. The approaches used in most literatures for determining the optimal allocation of DG... Read More
8. APPLICATION OF BAT ALGORITHM-BASED METHOD FOR MULTI-OBJECTIVE OPTIMAL NETWORK RECONFIGURATION AND DISTRIBUTED GENERATION PLACEMENT IN RADIAL DISTRIBUTION NETWORK
ABSTRACT
This dissertation presents an Application of Bat Algorithm-Based Method (BA) forMulti- Objective Optimal Network Reconfiguration andDistributed Generation placement in Radial Distribution Network. The BA approach presented in this work enables the reconfiguration of the network... Read More
9. DEVELOPMENT OF FIREFLY ALGORITHM BASED METHOD FOR DISTRIBUTED GENERATION PLANNING IN AN UNBALANCED THREE-PHASE DISTRIBUTION NETWORK USING VOLTAGE STABILITY INDEX
ABSTRACT
This research work presents development of Firefly algorithm (FA) and application of voltage stability index (VSI) for optimal planning of Distribution Generation (DG) in an unbalanced three- phase distribution network. The VSI was used to find the DG location while the FA was... Read More